School 01 / Pilot Proposed pilot

Software Engineering

Six months of programming, web, backend, testing and deployment. You finish with a portfolio and a capstone you present in public.

The month-by-month plan, on film.

A walkthrough of the six months is planned, one short film per month, from the same month plan written out below.

To be published

Reading the six-month plan

Walkthroughs are not published yet. The month table below is the same content in words.

[01] Outcomes

What you can do at the end.

Four abilities, each one demonstrated in a project rather than described in an essay.

[01]

Read and write code

You can take a written problem and turn it into a working program, then explain each line.

[02]

Build for the web

You can ship a responsive multi-page site and a backend with a database behind it.

[03]

Test and deploy

You can write tests, find a security mistake before someone else does, and put the app online.

[04]

Work in a team

You can split work, review someone else's code, and present the result without hiding behind slides.

[02] The six months

Month by month, with the output.

Proposed, not final

Six months, six outputs

MONTH 01 Programming foundations Small programs and a Git repository MONTH 02 Web fundamentals A responsive multi-page website MONTH 03 Backend and data A working CRUD application MONTH 04 Engineering practice A tested app with documentation MONTH 05 Team project Project milestones and a review log MONTH 06 Capstone A portfolio-ready project, presented
Month Focus What you finish with
Month 01 Programming foundations Command line, version control with Git, and problem solving in a first language. Small programs and a Git repository
Month 02 Web fundamentals HTML, CSS and JavaScript, built as pages a real person can open on a phone. A responsive multi-page website
Month 03 Backend and data APIs, databases and the server code behind a form. A working CRUD application
Month 04 Engineering practice Testing, security basics and deployment. A tested application with documentation
Month 05 Team project A small team builds one thing, with mentor reviews at each milestone. Project milestones and a review log
Month 06 Capstone Finish, document, and present the work in public. A portfolio-ready project and a presentation

A proposed structure. It can change before the cohort starts, and any change is published here rather than announced in a live session.

[03] Prerequisites and workload

What you need before day one

  • Computer A laptop or desktop. A phone is not enough for the labs.
  • Internet Enough for a live session and a package install.
  • Time The proposed load is 10 to 15 hours a week.
  • Language Comfort reading technical English. Tamil is supported in sessions.

No prior programming is assumed. No entrance exam.

What is not required

  • No degree, diploma or mark sheet is checked at application.
  • No age bracket is published yet. The minimum age is a founder decision.
  • No fee is collected before the fee page is published.
  • No laptop is provided.

Honest note

If you cannot commit ten hours a week for six months, this programme will not work for you. That is the main prerequisite, and it is not a formality.

[04] Assessment

How the work is marked.

Final rubric before admissions
Dimension Weight What the marker looks at
Conceptual understanding 20% Quizzes, oral explanations and short written responses.
Practical assignments 30% Individual work, marked against a written rubric.
Projects 30% Functionality, quality, originality, documentation and iteration.
Communication and collaboration 10% Peer work, presentations and technical writing.
Final demonstration 10% A live walkthrough, questions and a short reflection.

Attendance is not a grading component. Work that is not submitted is not graded. The final demonstration is individual: the project may be built by a team, but you present and answer for your own part.

[05] Questions

Before you apply.

If a question is not answered here, write to admissions@sethu.skills.

Is this a degree?
No. It is a certificate of completion issued by SETHUPATHI TECHNOLOGIES LLP. It is not a degree and not equivalent to one.
Will this get me a job?
There is no placement guarantee. You leave with a portfolio, a certificate, a verification record and interview practice. Referrals happen only where a real partner and a real opening exist.
Is the fee published?
Not yet. The fee model, amount and refund terms appear on the fees page before applications open.
Can I work while studying?
The load is 10 to 15 hours a week. Evenings and weekends are the usual pattern, but live sessions have fixed times.
What language are the sessions in?
English, with Tamil support. Technical terms stay in English: Git, API, GitHub.
What happens if I fall behind?
Mentors review progress at each milestone. Falling behind is a conversation, not an automatic removal.

Admissions are interest only.

Register interest and you will be told when the window opens, with the dates published here first.